WebStep One : Gently lift up the shingles on the edge of the roof and locate the nails holding the existing drip edge onto the roof. Step Two : Use a flat pry bar and hammer to pry the nails out of the drip edge gently. Step Three : Once free, slide the drip edge out and discard. WebJul 23, 2024 · Roofing felt Staples or roofing nails Instructions Apply and Attach the Drip Edge Apply the drip edge to the eave. Cut the drip edge flashing at an angle at the corner, press it lightly against the eave end (not too hard or you'll misshape it), and drive a nail …
Should a roof drip edge be placed above or below roofing felt?
WebOct 4, 2024 · The drip edge is placed over the felt paper underlayment as it moves along the rake edges. ... To install roof felt and drip edge, first measure the width of the roof and cut the felt to size. Next, nail the felt to the roof deck, starting at the bottom edge and working up. Be sure to overlap each row of felt by at least 2 inches. WebOct 12, 2024 · How To Install Roof Felt And Drip Edge. To install roof felt and drip edge, first remove any old felt or drip edge from the roof. Next, measure and cut the new felt to size, allowing for an overlap of at least 2 … holly d smith sanibel
How to Install Modified-Bitumen Roofing - Better Homes & Gardens
WebHow to Install a Drip Edge. Slip the wide, flat flange of the material all the way under the first course of roof shingles, as illustrated. Make sure the outer edge extends over the … WebDec 27, 2024 · All drip edges along roof eaves, valley liners and flashing need to be installed before the roof paper layer is laid down. Only a drip edge along the roof rakes is installed after the paper. Step 1 – Prep the Area Step 2 – Roll it Out. Start at the bottom edge of the roof and roll the paper roll out toward the peak. Step 3 – Overhang Paper WebThe Galvanized Steel Flashing subsection of the Residential section of the NCE will be used to determine the labor cost for installing the drip edge. The drip edge 2 ½″ x 1″ x 10′ option will be used. The labor is estimated based upon 10-foot lengths of drip edge (NCE Figure 10-4). The calculation for determining the quantity is. The ... humboldt county dhhs logo